Skip to content
Bankers TutorialLearn Today. Lead Tomorrow.

BANKERS TUTORIAL · IBPS & RRB · EXAM-PLANNING GUIDE

Study plan: Pipes, leaks and net filling rates

Track tank capacity as one job, combine inlet and outlet rates with correct signs and handle pipes that start or stop in separate time segments under explicitly constant-rate assumptions.

01 / 03Learn with a clear direction

2 min read Original learning material · Prepared 14 Oct 2026

This is an original preparation plan, not a new examination announcement. Check dates, stages, eligibility and application instructions in the issuing authority’s current notice.

01 / UNDERSTANDING

Plan your preparation

Use ordinary work-rate practice first, then add one outlet. Review the sign and expected direction before calculation so a physically impossible faster-fill answer is caught early.

02 / UNDERSTANDING

The concept in context

A pipe filling a tank in a stated time contributes the reciprocal of that time as capacity per unit time. An outlet removes capacity and therefore enters with a negative sign. Add compatible rates to obtain the net change, then divide the unfilled capacity by a positive net filling rate when asking for completion time.

03 / UNDERSTANDING

A worked learning case

Original educational case. In an original tank problem, an inlet fills in six hours and an outlet empties a full tank in twelve hours at constant rates. Together the net rate is 1/6 − 1/12 = 1/12 tank per hour. Starting empty, filling takes twelve hours. Adding both rates as positive would wrongly predict faster filling despite the leak.

ORIGINAL EDUCATIONAL PRACTICE

Try it before you check.

Original practice: An inlet fills a tank in 4 hours and a leak empties it in 12 hours. How long to fill from empty with both active at constant rates?

Show the answer and reasoning

6 hours.

The inlet contributes 1/4 tank per hour and the leak removes 1/12. Their net is 3/12 − 1/12 = 2/12 = 1/6 tank per hour. One whole tank therefore takes six hours. The result is slower than the inlet’s four hours alone, a sensible check when an active leak opposes filling.

Two traps to watch for.

  • Adding an outlet rate as if it fills the tank.
  • Ignoring the capacity already filled before a pipe changes state.

YOUR TOPIC-SPECIFIC LEARNING MAP

Build your next study session

  1. Choose capacity or common work units.

  2. Assign a sign to each rate.

  3. Track remaining capacity after every stage.

Explain the idea, apply it to a new situation, then check what changed in your reasoning.

BANKERS TUTORIAL · SOURCE NOTES

Keep the source alongside your notes.

Official links provide subject context and authoritative reference material. This guide’s explanation, scenario and question are original Bankers Tutorial learning content.

  1. www.ibps.in https://www.ibps.in/
  2. www.ibps.in https://www.ibps.in/index.php/faq/

For IBPS & RRB preparation, check the current official notice before relying on changing dates, rules or examination requirements.

← Back to Upcoming examinationsExplore the IBPS & RRB study guide →

KEEP YOUR LEARNING CONNECTED

Continue with a related idea.

EXPLORE YOUR NEXT STEP

Invest in your preparation.

Explore the course content, preview available lessons and choose your learning path.

Browse all courses